Looking for advice. Do any of you mechanics on here know approx how many hours of labor it should take to: Assuming a boats in yard with tools on hand and a Labor rate of $100 per Hour this is the Hours/Rate I'm being told
1. Remove and Replace two rudders. 7.9 Hours
2. Replace Lower Rudder Bearings 5.5 Hours
3. Replace Upper Rudder Bearings and Collers 5.5 Hours
4. Replace Rudder Packing 3.1 Hours
5. Replace Worn Tiller ends 1.71 Hours
6. Replace Main Engine Seacock 11.43 Hours
7. Replace 6 Cutless Bearings 16.39 Hors
8. Replace/Rebed Rudder bolt for bonding wire 1.8 Hours
9. Install new shaft 3.6 Hours
10. Install new dripless shaft seals 22.18 Hours
11. Install Customer provided Bilge Pump 3.15 Hours
12. Scrape, sand, clean bottom, running gear and Strainers. 22.5 Hours
13. Apply Prop Speed 2.17 Hours
14. The Kicker, Inspect Through Hulls/Seacocks and advise 1.80 Hours
15. Remove and install props inspect running gear, advise 4.1 Hours
You would think that some of the labor would overlap. Such as rudder removal/replace and Rudder Packing. Dripless seals and replacing of one shaft that was already out and going back in anyway, along with removing and installing wheels.
Any Thoughts would be appriciated.
Thanks
Tony
1. Remove and Replace two rudders. 7.9 Hours
2. Replace Lower Rudder Bearings 5.5 Hours
3. Replace Upper Rudder Bearings and Collers 5.5 Hours
4. Replace Rudder Packing 3.1 Hours
5. Replace Worn Tiller ends 1.71 Hours
6. Replace Main Engine Seacock 11.43 Hours
7. Replace 6 Cutless Bearings 16.39 Hors
8. Replace/Rebed Rudder bolt for bonding wire 1.8 Hours
9. Install new shaft 3.6 Hours
10. Install new dripless shaft seals 22.18 Hours
11. Install Customer provided Bilge Pump 3.15 Hours
12. Scrape, sand, clean bottom, running gear and Strainers. 22.5 Hours
13. Apply Prop Speed 2.17 Hours
14. The Kicker, Inspect Through Hulls/Seacocks and advise 1.80 Hours
15. Remove and install props inspect running gear, advise 4.1 Hours
You would think that some of the labor would overlap. Such as rudder removal/replace and Rudder Packing. Dripless seals and replacing of one shaft that was already out and going back in anyway, along with removing and installing wheels.
Any Thoughts would be appriciated.