Maynard Rupp
Legendary Member
- Joined
- Apr 12, 2005
- Messages
- 2,566
- Status
- OWNER - I own a Hatteras Yacht
- Hatteras Model
- 36' CONVERTIBLE-Series II (1983 - 1987)
I decided to re do the shaft packing with Gore Tex GFO material. We had the boat out over the weekend to re-paint the bottom. (That is another story). I read my Hatteras owners manual which provides a nice drawing and says the packing is 1/2''. The GFO packing company makes a nice listing of required sizes for different size shafts. Their data also said I want 1/2" for our 13/4" shafts. Sure enough, when I remove the old packing it is smaller than 1/2". I made my rings, then flattened the stuff with a hammer so it would slide in. When we launched it was dry. I idled out of the Miami river and downtown area. When I got to Biscayne Bay, I went below to check on my packing. I burned my hand pretty bad when I touched the stuffing box. I limped to our slip. I now plan on spending another bag of bucks to get the 3/8" packing that I should have had in the first place. Lots of bad information in the world of boat maintenance. I am going to re-pack while the boat is in the water. Pascal says it is easy, does anyone else have an opinion or a trick to do the job easily?