savarese1
Active member
- Joined
- Feb 15, 2014
- Messages
- 63
- Status
- OWNER - I own a Hatteras Yacht
- Hatteras Model
- 53' MOTOR YACHT (1969 - 1988)
I have quote to insal Tides Shaft Seals
Labor $3,080, Material 1,357 total 4,437
This does not include haulout or blocking as the boats already out of the water. We are located in Savannah GA. It seems excessive to me but wanted other opinions
Cover and protect path on main deck, steps and passageway on the port and
starboard side of the engine room aft doors.
Just inside the engine room aft doors, the main sea strainers are located. Remove
the sight glasses and internal components and store in a safe place. Unbolt hte
port and starboard propeller shaft coupling bolts. Loosen packing glands and pull
shafts aft to access coupling nuts. Remove coupling nut retainers and remove
nuts. Set up strong-back and jack on couplings. Obtain hot work permit for both
engine rooms. Heat and remove couplings from shafts. Loosen clamps on
packing gland hoses and remove same with packing glands. Clean I.Ds of
couplings and O.Ds of ends of the stern tubes and shafts.
Furnish and install 2 new Tides Sure Seal with spare seals and carriers. Install
new seals on stern tubes. Reinstall port and starboard shaft couplings, coupling
nuts and secure nuts. Rig an dpull shafts to engine couplings and bolt couplings
together. Install port and starboard main engine strainers and reinstall any
removals. Clean work area and remove the cover & protect material.
Labor $3,080, Material 1,357 total 4,437
This does not include haulout or blocking as the boats already out of the water. We are located in Savannah GA. It seems excessive to me but wanted other opinions
Cover and protect path on main deck, steps and passageway on the port and
starboard side of the engine room aft doors.
Just inside the engine room aft doors, the main sea strainers are located. Remove
the sight glasses and internal components and store in a safe place. Unbolt hte
port and starboard propeller shaft coupling bolts. Loosen packing glands and pull
shafts aft to access coupling nuts. Remove coupling nut retainers and remove
nuts. Set up strong-back and jack on couplings. Obtain hot work permit for both
engine rooms. Heat and remove couplings from shafts. Loosen clamps on
packing gland hoses and remove same with packing glands. Clean I.Ds of
couplings and O.Ds of ends of the stern tubes and shafts.
Furnish and install 2 new Tides Sure Seal with spare seals and carriers. Install
new seals on stern tubes. Reinstall port and starboard shaft couplings, coupling
nuts and secure nuts. Rig an dpull shafts to engine couplings and bolt couplings
together. Install port and starboard main engine strainers and reinstall any
removals. Clean work area and remove the cover & protect material.