metama
Well-known member
- Joined
- Mar 6, 2019
- Messages
- 261
- Status
- OWNER - I own a Hatteras Yacht
- Hatteras Model
- 53' MOTOR YACHT (1969 - 1988)
OK, So we have the original air handlers in the boat. They are loud, one fan motor just died. I was looking at some big replacements in the winter but just got a quote to replace all the Cruisair with non piston compressor modern domestic or CTM split units.
So that is 12-16k in units.
Flushing and pressure testing lines.
Replacing splits and compression is the same location.
Relocate only 1 thermostat so we don't have to run control lines to the aft salon.
How many hours is that?
I just got quote 20k plus about 15k equipment. 35K total.
4 compressors / 5 air handlers
Seems excessive.
Anyone still make a R22 air handler? Motor replacement x 2 isn't sounding so bad right now.
So that is 12-16k in units.
Flushing and pressure testing lines.
Replacing splits and compression is the same location.
Relocate only 1 thermostat so we don't have to run control lines to the aft salon.
How many hours is that?
I just got quote 20k plus about 15k equipment. 35K total.
4 compressors / 5 air handlers
Seems excessive.
Anyone still make a R22 air handler? Motor replacement x 2 isn't sounding so bad right now.