Vincentc
Legendary Member
- Joined
- Jun 3, 2008
- Messages
- 1,514
- Status
- OWNER - I own a Hatteras Yacht
- Hatteras Model
- 43' DOUBLE CABIN (1970 - 1984)
I had a few more zipper failures with the canvas and vinyl aft deck enclosure and decided to replace it all with hard acrylic. I took off all of the canvas and started to work on the new project. I've completed about 2/3 's of the area and am pleased with the results.
The panels are 2'x4' 1/8" cell cast acrylic. The top edge is set in 1/4" stainless "U" channel and I drilled a couple of holes in the stainless to hold the panels at the top. The sides are secured with 3M Dual lock.
It had been very humid and there is some condensation on the acrylic.
Once I get the enclosure completed I will start on the 1/2" acrylic wing doors.
The panels are 2'x4' 1/8" cell cast acrylic. The top edge is set in 1/4" stainless "U" channel and I drilled a couple of holes in the stainless to hold the panels at the top. The sides are secured with 3M Dual lock.

It had been very humid and there is some condensation on the acrylic.
Once I get the enclosure completed I will start on the 1/2" acrylic wing doors.