I uploaded the full size PDF file on Drop Box. Here's the link...
Blue Arrow SKKG2391A_PROPOSED GENERAL ARRANGEMENT.pdf
https://www.dropbox.com/s/ifqutfxuiw...EMENT.pdf?dl=0
Welcome to the Hatteras Owners Forum & Gallery. Sign Up or Login
+ Reply to Thread
Results 61 to 70 of 109
-
10-10-2020 11:54 AM #61Senior Member
- Join Date
- Jun 2020
- Posts
- 50
Re: 1972 Hatteras 45 Convertible Refit
-
10-11-2020 08:18 AM #62Senior Member
- Join Date
- Jun 2020
- Posts
- 50
Re: 1972 Hatteras 45 Convertible Refit
Today we lifted the boat. Considerable fouling. Zinc anodes depleted. Cutless Naval Brass Bearings (propeller shaft) need replacement. Cleaning underway. Will keep you posted. Thanks - Karim
-
Re: 1972 Hatteras 45 Convertible Refit
Wow. How long since the last haulout, or was that before you acquired her? That is a lot of growth.
-
Re: 1972 Hatteras 45 Convertible Refit
Well, I'll be damned. DLBA division of Gibbs & Cox. G&C were the designers of the SS United States, William Francis Gibbs, principal naval architect. I didn't know G&C were even still around. THAT is pretty cool.
-
10-11-2020 06:42 PM #65Senior Member
- Join Date
- Jun 2020
- Posts
- 50
-
10-11-2020 06:43 PM #66Senior Member
- Join Date
- Jun 2020
- Posts
- 50
-
Re: 1972 Hatteras 45 Convertible Refit
G&C have a stellar resume. And Donald Blount designed some of the best yacht hulls ever made, including the Hines-Farley offshore yachts.
-
10-12-2020 04:39 AM #68Senior Member
- Join Date
- Jun 2020
- Posts
- 50
Re: 1972 Hatteras 45 Convertible Refit
Waterline and Antifouling Paint Level
I've noticed that there's fouling and some corrosion on the topside of the hull above the previous waterline which is evident after the lifting yesterday. You can see it in some of the previous images.
I checked that our bilge pumps are functioning well. The propellers seem fine. There's no substantial weight addition in the stern. We will be adding the GRP swim platform but that's not of significant weight either.
My direction is to raise the antifouling paint line to reach the actual waterline. I hope this further protects the hull until the next lift.
Thanks,
Karim
-
10-13-2020 04:41 PM #69Senior Member
- Join Date
- Jun 2020
- Posts
- 50
Re: 1972 Hatteras 45 Convertible Refit
Update: Cleaning the hull is well underway. Checked propellers and rudders, cleaned and replaced zinc anodes. Will share more photos tomorrow.
-
10-14-2020 08:28 AM #70Senior Member
- Join Date
- Jun 2020
- Posts
- 50
Re: 1972 Hatteras 45 Convertible Refit
Swim Platform Installed
Earlier today we installed the locally manufactured swim platform as per the pictures here. I'm still looking for a boarding ladder to fit beneath. The options are a bit overwhelming. I would greatly appreciate any guidance as to the most trusted brand.
Many thanks,
Karim