Welcome to the Hatteras Owners Forum & Gallery. Sign Up or Login

Enter partial or full part description to search the Hatteras/Cabo parts catalog (for example: breaker or gauge)
+ Reply to Thread
Page 2 of 10 FirstFirst 1 2 3 4 ... LastLast
Results 11 to 20 of 98
  1. #11

    Re: Winter Project Begins

    It's going to be a little Chilly tomorrow, stay warm.
    Eddie Clemons Nashville, TN Southern Pride 1988 52CHATCS441K788 2004 Caterpillar 3406e's

  2. #12

    Re: Winter Project Begins

    Finished the "plank or ramp"
    Very short spans.. 2x10 SYP with edge glued and screwed 2 x 4's .. 2 inch lip to retain dolly and drip pan sliding to galley level
    Attached Images

  3. #13

    Re: Winter Project Begins

    Looks great.
    ENUFF. 1983 53MY.Hull #617 Barnegat Light Nj.

  4. #14

    Re: Winter Project Begins

    It's aboard! Phase 1 complete. Phase 2 moves it to the genny room. Next is installing the down ramp and beam trolley.
    Attached Images

  5. #15

    Re: Winter Project Begins

    In the pilothouse on the dolly.
    Attached Images

  6. #16

    Re: Winter Project Begins

    Maybe it's me, but I'm bothered by the fact that the temporary construction looks better than most of my permanent jobs.
    --- The poster formerly known as Scrod ---

    I want to live in Theory, everything works there.

    1970 36C375

  7. #17

    Re: Winter Project Begins

    You know something? I was thinking the same thing.
    Semper Siesta
    Robert Clarkson
    ASLAN, 1983 55C #343
    Charleston, SC

  8. #18

    Re: Winter Project Begins

    My handi dandi engineers pocket reference didn't have a span table for southern yellow pine on it's side.. so I over did it with the side banding. Max span was 5 feet, and it didn't deflect at all! The lifting gantry was engineered for 4k. The failure would have been the hoist. By myself, working with 1,000 lbs, and 17k overhead... yeh, I was pretty careful!

  9. #19

    Re: Winter Project Begins

    Fun and games!
    1978 53' Motor Yacht "LADY KAY V"
    Hull number 524
    Chesapeake Bay

  10. #20

    Re: Winter Project Begins

    Got the beam trolley installed. Ramp is next.. then it's showtime!
    Attached Images

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts