Quote Originally Posted by bigbill View Post
great description of the work involved. you are doing this the RIGHT way. this is the same way a friend that works at a large composite company told me how to do mine. on small areas i drilled 3 inch holes and dug out the rot then poured 4lb foam onto the hole, let it dry and replaced the top in the same was as you described above
Thank you Bill! Cheers!