Hello everyone,

This spring we became owners of a project yacht, she has been pulled and a complete bottom done, no blisters were found some scrapes in the bow and replaced the port prop. all the zinks were changed, rudder posts were repacked, the twins have less than 200 hours SMOH and run like new. New Fixed CO2 System & 12 Fire Extinguishers Type I & II.

Now the big step the Admiral wants a new galley with a side by side refrigerator.....

How do I get it into the boat?

We are doing a complete rewire with a change from 32 volt to 24 volt, removing all the DC lighting and going with 120 volt LED.

Steven A. (Deckhand with Master Unlimited Oceans & Great Lakes Pilot License)
Sandra J. (Admiral Full time Grandma)
Wesley B. (Steward Retired & part of the dream, 100 ton Master License)

Pirates Treasure
1972 58 Tri-Cabin (the Dream)
12V-71N's (The twins)