Ray
1. When we redid the flybridge we filled in the screws so no more screws.
2. Completely redid the console.
3. Removed old windlass, old halon.
4. Removed the bow rail
5. Removed the power transformer
6. Replaced the fresh water system pump.
7. glassed in the port holes.
8. got rid of most the scoops.
9. Added Slane intake vents
10. Cut down the flybridge rail stantions and tilted it backwards instead of the forward facing venturi.
11. Most of the other stuff was cosmedic.
12. The boat stays undercover so right now I don't even have a Bimini, but plan to get one this spring.
13. Of course expoxy painted the bilge adding new waste hoses.
14. New cushions, new chairs etc..
have fun boating garyd
Welcome to the Hatteras Owners Forum & Gallery. Sign Up or Login
+ Reply to Thread
Results 41 to 41 of 41
Thread: Hatteras for refit
-
12-04-2005 08:57 PM #41
Re: Hatteras for refit